tape bonding process
5,tape bonding process
(A) the tape joint method:
1. Mechanical connection method: conveyor belt system
Metal Buckle fixed to the two joints, the penetration pin, so that the two heads connected. Features: simple operation speed, detachable, but the intensity is low, only the intensity of the original tapes of 30% to 60%, flexible joints at the poor and other items easily damaged roller, vibration, noise big, there is leakage.
2. Cold adhesive connection method:
With specific adhesive will peel the first adhesive layer 2, adhesive to fully roll, the static discharge for more than two hours, the same operation and hot-sticky. Features: No leakage, noise, vibration, without expensive equipment, but its drawback is that the lower connection strength, reliability is poor, can only be used in temperature limited, low security requirements and the general wear-resistant cases, does not apply wire rope core tape. Sidewall Conveyor Belt
3. Hot sticky connection method: — curing method.
HTV Joint of the modern ideal tape joints law, if the connection quality is high, their joint life expectancy can be compared with the tape itself, the life, the joint can be in any type of reinforcing materials with a core carried out using a Portable, flat vulcanizing machine to connect the pressure treatment, curing, or to provide financial access required pressure and temperature.
Joint construction of many forms, depending on the tape structure is multi-layered, double deck, single layer, pvc entire core, or wire rope cores.
Connector should be using the new plastic materials, plastic sheets, and mortar, adhesives, their composition and properties must be used with the manufacture of belt materials in line. The use of semi-vulcanized rubber and adhesive gel has a bad effect, the joint may be premature fracture, accident incidents. For the heat, cold, Steel Cord Conveyor Belt oil, acid, alkali flame-retardant and other special tape, should pay attention to use the appropriate adhesive rubber material, or joint effect of achieving the desired effects.
Joint operation of establishments, we must absolutely dry, clean, no dust, can not be exposed to the sun, for damp places and need to repeatedly remove the water vapor, if necessary, puts up tents.
Curing equipment: vulcanizing machine, peeler, cutting knives.
Thermal curing of shortcomings: long, costly.
(B) heat curing Joints form and connector length of
1. Fabric core conveyor belt
1) single-layer fabric form the core zone of the connector
Minimum ladder length LS = 200 ~ 300mm
Connector Length
LV = 250 ~ 350mm
Seal 50mm.
2) multi-layer fabric form the core zone of the connector.
According to fracture with a type that is the fabric layer to decide the length of the length and connector
Ls = 150 ~ 350mm
Lv = 50 ~ 100 + (fabric layer -1) × Ls
For more than two levels using oblique joints, plagioclase La = 0.3 × bandwidth
Total joint length Lu = (geotextile layer -1) × Ls +50 ~ 100mm
2. Steel cord conveyor belt
Steel cord conveyor belt to be vulcanized with hot method, the length of lap joints and the geometry of the connection must be in accordance wire diameter, pitch, wire rope breaking strength and with rubber adhesive strength of the extract, depending on joints in the wire rope should be a certain degree of Lap length, so that joint Department of steel cord and rubber adhesion is greater than the rope breaking rally.
If the spacing of wire rope can be placed in the middle of a rope and the necessary glue (1.5 ~ 5mm), then the connection will be steel cord conveyor belt has a good state, may be an overlap, if the rope is not enough space to place tensile steel wire rope and conduction force the middle of the rubber, then the need for multi-level overlap.
Belt Model ST630 ~ ST1000
Lv = 600 ~ 700mm
Lst = 300 ~ 400mm
Belt Model ST1250 ~ ST3150
Lv = 1250 ~ 1750mm
Ls ≥ 3d (wire rope diameter)
The rest of the dimensions of a connector size
Belt Model ST4000 ~ ST5000
Lv = 2950 ~ 3550mm
The remaining dimensions with a
(C) Ordinary polyester tape bonding process (EP-200, B = 1400mm, Z = 25 layers, the plastic 6mm, under the plastic 3mm)
1. Pre-bonding preparation.
1) Site requirements:
Clean, dry, non-exposure, no dust, easy to work, take the work platform.
2) Tools to prepare:
A variety of cutting knives, pressure roller, cutting pliers, wrench, screwdriver, electric grinding tools, wire wheels, wire brush, paste brush, cleaning brush, stripping pliers, traction devices (winches), tape measure straight, angle square, marking with on a (ink fountain, chalk), thermometer, stainless steel bucket (with lid), stainless steel pots, rubber gloves.
3) The required material preparation:
120 # aviation gasoline, flour glue, core adhesive, mortar with plastic, and will mortar soaked 24 hours in advance. Petrol and rubber feed ratio of 5:1
2. Operating Procedures
A) a crossed
Will be placed on the tape flat work platform on the joints wipe clean, and set aside while the joint centerline, the base line, cut off the line, cutting line, cutting edge glue line, ladder pitch line.
2) cut peel
Accordance with the size of lines, oblique cutting, peeling, pay attention to the lower blade can not cut canvas.
3) play Mao
Electric wire brush with the canvas with a clear ladder of surface residual glue joints, pay attention to avoid polish polish or produce scorch phenomenon.
4) The joint step with the
Will be stacked two to test the accuracy of their joints with each layer is the same fabric layer 5-15mm gap between the stay, if not accurately be amended.
5) Glue
First cleaned with gasoline peeling layer, and then coating syrup at least twice, each post-secondary dry before coating the next mortar. Office space in the same fabric layer of paste buffer strip, note that if the adhesive does not dry, will produce bubble, resulting in reduced adhesive properties.
6) fit
Mucilage, after solvent evaporation, thoroughly dry, the two fit. Should be made the same tape on both sides of the joints tight or too loose ladder alignment, centerline alignment, from the middle to both sides of the laminate adhesive tape to facilitate the escape of air from both sides. In order to ensure joint quality, appropriate to cover the rubber seal at plus glue to strengthen canvas, its shape size at no more than the width of tape to prevent moisture absorption. After the fitting, full roll to prevent the accumulation of bubbles. Harvesting is not vulcanized rubber cover, first made of sealing tape, adhesive tape in the tape and glue on the interfaces of pulp, and fully rolling real prison.
7) sulfide
Connector pads on both sides of the tape width 40 ~ 50mm, thickness ratio with a thin body of 0.5 ~ 1mm, length 300mm longer than the length of the edge connector Department of horn, and use splint grip tape joints. (In two joints fit will be preceded by curing machine for the next frame, pressure plate pressure device, under the heating plate, white, in turn put away, in the tape joints cloth shop, and then stamped on a curing machine electric heating plate, insulation board, on the rack, and the next frame to find positive, aligned, tighten evenly.
Note: If more than one curing devices work side by side, in the upper and lower heating plate seams pad 0.2 × 50 × 1400mm of thin metal plates. For our on-site belt vulcanization, is two 1400 × 830, 1400 × 1000 specifications curing machine, when you need to use two simultaneously vulcanized.
Alignment of the upper and lower racks, looking for positive, you use bolt nut fastening the upper and lower racks, pay attention to bear in power should be homogeneous. Connected to the control box, pressure pumps and other equipment, connected to the power began to vulcanization.
Curing time of the control of process parameters: the first side of the heat, while suppressed, when the temperature about 70 ℃, the pressure to achieve 10kg/cm, when the temperature reaches 100 ℃, the pressure to achieve 16kg/cm, stop trying to restrict and continue heating, When the temperature reaches 145 ℃, has begun to count cure time, stop heating, heat 35 minutes after the end of curing, cutting off power supply, so that curing machine naturally cooled by cooling water is about 70 ℃ demolition vulcanizing machine.
from mold, finishing tape
Relieved vulcanizing machine, it will overflow adhesive tape on the connector and flash removal, finishing smooth and clean, the whole curing bonding completed.
3. Conveyor Belt Joint Attention
1) When laying should pay attention to the conveyor system, as well as around the face and non face into the direction, not a mistake, adjust the belt to center and center line roller frame.
2) The cutting should be the proper use of cutting knife, not cut canvas, otherwise it will reduce the tape strength, this cutting is usually in the layer with the canvas layer to stay 0.5mm residual layer, between layers in the canvas to stay 0.3mm residue layer.
3) to prevent undesirable or damage joints grinding canvas.
4) The adhesive surface should be kept clean from start to finish to prevent viscosity oil, water, or dust.
5) The canvas damp, it should be drying or drying further bonding, nylon canvas absorbent strong, operations should pay particular attention, there would be bubbles, delamination and other defects.
6) then the last one first, attention should be tightening the belt conveyor travel.
7) stripping the first time, pay attention to the determination of the upper and lower joints, to ensure that the above connection and operation in the same direction
to prevent the ladder overlap, otherwise the result in premature peeling.
9) coating evenly, avoid plastic or holes caused by ischemic
10) affixed bubbling appears timely, it should be pierced, exhaust after the compaction.
11) The use of plastic materials the same as the original tape and pay attention to the validity of rubber.
12) are equipped with appropriate mortar, and the foam into a paste with a seal kept in the cold after dark.
(D) fire-retardant steel core of the bonding process
With ST1600 type, bandwidth, 1400mm steel wire rope 12mm diameter and 5.1mm pitch down the middle of 3mm thick plastic 6mm thick plastic cover, for example.
1. Pre-bonding preparation work: with the ordinary flame-retardant polyester belt, tool coupled with off Pliers, wallpaper knife.
2. Operating Procedures
A) a crossed:
The joint part of the cleaning in the net, draw up the construction Size Line: base line, center line, cutting line, cutting line, cutting edge glue lines and core plastic incision line.
2) cut peel
Cut along the dash cover gasket adhesive strip, and then the direction along the rope cut out of steel wire rope steel wire rope scraped the surface layer, steel wire rope according to 1400mm, 700mm and white cut off.
3) play Mao
Disc with electric wire rope steel wire brush remove surface residue glue (or wallpaper knife), polish all parts of joints, note that the boundaries can not be polished edge of the exposed wire can not be beat Coke.
4) Coating
Steel wire rope and joints at bonding and cleaned, and coated twice mortar.
5) Lamination
Under the first curing machine rack, pressure plate, followed by the next heating plate put away, and then in white above the shop. Shop down adhesive plastic sheet, plastic cover in the next, the core glue in the pre-drying a good composite surface coating on the curing press after the heating plate (at actual size connector 1500 × 1400). Then the upper and lower cover rubber joints 45 ℃ bevel slope posted 1mm thick strips. The glue joints on the plastic sheet under the bonding, the pull to find are two joint center, was later to find the center of connector wire rope, according to two take joint approach from the center to edge both sides were ordered, and embedded filled plastic rope section, the wire rope as far as possible, straight edge rubber belt on both sides of Canada, in the butt rope gap (25mm) Department and other void fill in fill plastic and finally covered with adhesive plastic sheet on the first on the core glue, then glue the superstructure, in the middle Brushing mortar should be the last hand roller compaction, to improve the strength, can be built in between the plastic and the core layer of plastic hanging plastic canvas strengthened.
(Note: steel wire rope placed lap later, both sides plus the width of 50mm side edge glue, then glue on the core, cover glue, its thickness not less than the thickness of the original tape)
6) sulfide
Trim edge, while iron and tape placed firmly fixed in the final capped with white plastic cover, placed on heating plates, insulation panels, on the rack, and the next frame to find positive, aligned, tighten evenly.
Connection control box, pressure pumps, connected to the power to conduct vulcanization. Parallel use of two vulcanizing machine interface plus pad at 0.5mm thickness iron.
Curing parameters of control: first, heating, pressure, when the temperature to 80 ℃, the pressure required to achieve 18-20kg/cm2, then stop pressure and continue heating to 145 ℃, stop heating, count the curing time to 40 minutes later, curing the end, cut off power supply, so that curing machine natural cooling, the temperature dropped to 80 ℃, demolition vulcanizing machine.
7) from mold, tape trimming
Relieved curing machine, Office of the tape joint edges remove excess glue and finishing smooth and clean, thus, the entire curing completed.
3. Sulfide Note: the same as with ordinary polyester tape, another plus one to avoid being polished steel wire rope light, wear and tear.
Conveyor belt supporting frame buffer
Conveyor belt supporting frame buffer
Conveyor belt supporting frame buffer belt system from the foot support plate and support structure, support plate installed in the top of the foot support, support board set up on the side of the surface layer of a continuous period of support, conveyor belt system continuous support for the surface layer consists of a complex arrangement of ceramic or glass, steel composition , ceramics or glass, steel fasteners and the support plate through the link above to set foot support and flexible components. Elastic element constituted by a spring or hydraulic shock absorbers. Supporting the two ends of a continuous surface layer of the upper side was inclined plane. Ceramic or glass, steel rectangular or circular in cross section appear before. Supporting frames in the continuous support of the lower side conveyor belt, the impact and operation of the process of blanking material contained in the vertical vibration energy from the support bracket feet absorbed in the elastic element will enable the conveyor system running smoothly by the material is not easy to run partial, continuous support surface layer from the ceramic or glass, steel structure, damping coefficient is small, rubbing, and flame-retardant, suitable for the existence of gas gas mines.
Water-based PU adhesive applied to study new trends in the footwear industry
Water-based PU adhesive applied to study new trends in the footwear industry
conveyor belt system HC shoe Net December 31 hearing, the Guangdong-odd Chemical Technology Co., Ltd. is a joint venture of the large-scale chemical science and technology enterprise, specialized in producing adhesive products, including water-based PU adhesive, environmental protection, non-triphenyl PU adhesive, grafted rubber, all-purpose adhesive , handling agent, starch glue, spray, fitting rubber, curing agent, cleaning agents a total of more than 100 varieties. Is part high-strength group, is located in Sanshui District, Foshan City, Guangdong Province, Lubao Industrial Development Zone, covers an area of more than 50 million square meters, equipped with large-scale innovation and technology center, Institute of Polymer Chemistry, has imported a full set of precision in 2000 production line and testing equipment with an annual capacity of 10 million tons.
Use of non-toxic bonding technology sound production, Rubber Conveyor Belt has been widely advocated in the community, which is to adapt to the development needs of today’s society, it reflects the corporate social responsibility. When more and more shoe-making workers aware of their lack of safe and dignified work environment, or at the expense of their health in exchange for basic necessities, they will not have too much footwear industry goodwill. How to provide workers with a safe working environment, more and more attracted industry attention. Multi-Chemical Technology Co., Ltd. is a long time ago the green bonding technology into the shoe-making industry, its multi-water-based PU adhesives is a positive and environmentally friendly products, while being water-based adhesive can be used more effectively to prevent the abuse of solvent-based adhesives produced by poison, to improve the working environment, health status, help to enhance and improve the enterprise’s image and competitiveness.
Sidewall Conveyor Belt
For more than half of the world’s total footwear production in China, will cause the safe production of green revolution, will make more people know how to avoid the harm of toxic chemicals, so that pairs of shoes to consumers and producers undertake to completely of security responsibilities. Water-soluble adhesive is milky white latex-like, after drying and infrared-activated, there is no color, was transparent and shaped, and will not have any yellowing. Multi-PU adhesives and neoprene is water-based adhesives can be applied to shoes, CR processing the various bonding processes, such as for the heel after the sets, molding, EVA / Phylon midsole, at the end of processing, shoe sewing machine, rubber outsole The adhesive bonding. Minimizing VOC (volatile organic components), to avoid physical harm to employees and damage to the surrounding environment. Solid Wood Door
Solvent because of the risks involved in most organic solvents with a flammability, and most organic compounds can cause air pollution and smog formation. When the organic solvent to fully evaporate in the air when the concentration reaches a certain level, organic solvents or volatile gases will be ignited to cause the explosion. Therefore, storage of organic solvents, fire prevention is essential. In addition, these potentially dangerous volatile hazard can be eye contact, skin, inhalation, mouth or nasal inhalation and other ways to invade the human body, the health impact.
China’s shoe industry status quo as the labor-intensive use of plastic footwear industries, and solvent-based shoe glue in the country still dominant. And female employees take a major role in the volatile solvent environment, mental fatigue and illness more easily, so that pregnant women and fetuses increased the risk of the majority of workers do not have regular check-ups, frequent overtime, so that the situation has changed get worse. The whole industry is still widespread in the poor working environment, coupled with the use of solvents, Polyester Conveyor Belt leading to more serious diseases frequent. Fujian has two more than 1000 shoe factories, more than 20 million workers, nearly 800 forming lines and nearly 2,000 family workshops, production reached 400 million pairs of various types of sandals, sports shoes, casual shoes. However, solvent-based adhesive commonly used in Fujian province, about nearly 3 million workers exposed to hazardous chemicals, many of the workers suffering from occupational diseases can not afford medical expenses, poor working environment is causing the loss of workers, the labor shortage more serious, created a series of social problems. Fujian is just one example. In order to improve the working environment, a number of plants increase investment, equipped with ventilation and ventilation devices, welcome home water tower, tower conveyor belt, fire flower rubber flooring, masks, carbon face mask, etc., but the workers are still set to remain high in the toxic, volatile and strong solvent-free environment. On the other hand, in order to reduce the pollution of toxic and irritating solvent, configuration, ventilation systems and other facilities has also brought high additional costs.